Assembling, Commissioning & Testing

Koza Fire Protection Systems ensures the highest standards not only in the design phase of fire safety solutions but also in installation, commissioning, and testing processes. We meticulously manage each step to guarantee maximum safety during implementation.

Installation Process

The installation of fire suppression systems is carried out by our expert technical team. All installation processes are performed in accordance with the standards set during the design phase and tailored to customer requirements. The materials and equipment used in the systems are TSE and CE certified, and all necessary safety precautions are taken during installation.

Our installation team follows all necessary steps to ensure that each component is placed correctly and that the entire system functions efficiently. Throughout the implementation process, system parameters are optimized to operate at peak performance.

Commissioning Process

Once the installation is complete, the commissioning phase begins. This crucial step ensures that all system components function correctly and that the system’s performance meets expected standards. During this phase, each system parameter is tested, including fire detection, alarm activation, and suppression equipment integration.

Our expert engineers verify that all system functions operate as required before finalizing the commissioning process. Additionally, fail-safe mechanisms are reviewed to ensure system reliability in the event of malfunctions.

Testing and Inspection Process

After commissioning, a series of tests and inspections are conducted to evaluate the system’s response to various fire scenarios. These tests are performed in compliance with international standards such as NFPA and EN.

The tests include:

  • Pressure tests to verify system integrity
  • Flow tests to assess water or suppression agent distribution
  • Leakage tests to ensure system reliability
  • Automatic activation tests to confirm system responsiveness

These tests guarantee the system’s flawless operation in case of a fire emergency.

Following the commissioning and testing phases, detailed reports are prepared for each system component and presented to the client. These reports serve as official documentation, proving that the system has been tested and meets the required safety standards.

Training and User Orientation

After the system is commissioned, training sessions are conducted to ensure that users can operate the fire protection system effectively and correctly. These sessions provide detailed information on:

  • Fire safety procedures
  • Emergency action plans
  • System operation and response mechanisms

With Koza Fire Protection Systems, you can be confident that your fire suppression system is installed, tested, and ready to provide maximum protection.